There was no reefing system installed. The mainsail has two reef points with grommets to tie, but no mechanism to backhaul or shape the reefed sail. The problem was addressed by adding two cheek blocks, and to cleats to the starboard side of the boom and two pad eyes to the port. Reefing lines were the run from pad yes, under the sail pack, through the reef clew, back down under the sail pack, through the block and to the cleat. The blocks and cleats were offset to avoid interfering with one another. The cleats were placed near the main halyard so they can be operated from the same position.